景观设计的原则
- 低碳节能建筑设计的相关问题及解决方法
- 江苏建筑职业技术学院图书馆设计文化理念
- 四川雅安名山县涌泉村抗震小学的设计理念
- 四川汶川5.12大地震的启示
- 汶川大地震震中纪念馆的创作思考
- 洛阳洛南新区雅安新城结构设计
- 绿色居住建筑的节地设计
- 广州珠江新城海心沙地下空间建筑设计方案
- 黔东南地区郎德苗寨民居的热适应性
- 西气东输工程中长输管道站场建筑模块化设计与应用
内容提示:Landscaping combines elements of art and science to create a functional, aesthetically pleasing extension of indoor living to the outdoors. One initial purpose of landscape design is to blend man's te
Landscaping combines elements of art and science to create a functional, aesthetically pleasing extension of indoor living to the outdoors. One initial purpose of landscape design is to blend man's technology (house or building) into the natural surroundings. To work toward a desirable landscape design, the landscape horticulturist must have a working knowledge of art elements and design principles.
Elements of Art
Elements of art include but are not limited to color, line, form, texture and scale. These elements are never independent of each other, but we will discuss their individual natures before considering the interactions.
Color
Color variation can best be explained by use of a color wheel. Primary colors are red, blue and yellow. Orange, green and violet are called secondary colors because they are combinations of two primary colors. For example, yellow and red are combined to yield orange. Tertiary colors are the fusion of one primary and one secondary color. These colors would be between primary and secondary colors.
Tint refers to a light value and is accomplished by adding white to the pure color on the color wheel, while shade is a dark value and is created by adding black to the pure color on the color wheel. Black, white and grey are neutrals and are compatible with any color. Light colors and tints tend to attract attention, as do bright, vivid colors.
Colors are combined into color schemes for practical applications. Three basic color schemes are monochromatic, analogous and complementary. A monochromatic color scheme consists of different tints and shades of one color and is seldom achieved in its pure form in the landscape. An example of an incomplete monochromatic color scheme would include white and pink flowers with a background of a dark pink and red brick house.
Analogous color schemes combine colors, which are adjacent or side-by-side on the color wheel. An analogous color scheme could include green, blue-green, green-blue, blue and violet blue. This color scheme could be achieved by varying the foliage color from green to blue-green or by using pyracantha with orange-red berries against a red brick house.
Complementary color schemes combine colors directly across the color wheel. For example, red and green would be complementary colors. A complementary color scheme may be achieved by using plants with green foliage against a red brick house.
It is possible to have varying color schemes in one area of the landscape as the seasons change. White and pink azaleas flowers can yield a monochromatic color scheme with a red brick house. The green azalea foliage would produce a complementary color for the red brick during the summer. Pyracantha berries would be an analogous color to the red brick in the fall. The landscape designer should consider the color changes throughout the year when developing a landscape plan.
Colors can be used to visually change distance perspective. Warm colors and light tints like red, orange, yellow and white advance an object or area toward the observer. These colors and tints placed near the foundation of a house would make the house appear closer to the street. Cool colors and deep shades like blue, green and black recede and can be used to make the house appear farther from the street. Cool colors are restful while warm colors express action and are best used in filtered light or against a green or dark background.
Color can be used to direct attention in the landscape. Due to this strong characteristic, color should be used carefully. When color is used for this purpose, consideration must be given to year-round color not just to seasonal color. Consideration may also be given to the time of day when this color will be enjoyed. White or light tints could be used to create interest on a patio. Dark colors would add little to family enjoyment of this area as the daylight hours passed.
Line
Line is related to eye movement or flow. The concept and creation of line depends upon the purpose of the design and existing patterns. In the overall landscape, line is inferred by bed arrangement and the way these beds fit or flow together. Line is also created vertically by changes in plant height and the height of tree and shrub canopies. Branching habits of plants, arrangement of leaves and/or sequence of plant materials create line in a small area such as an entrance or privacy garden.
Straight lines tend to be forceful, structural and stable and direct the observer's eye to a point faster than curved lines. Curved or free-flowing lines are sometimes described as smooth, graceful or gentle and create a relaxing, progressive, moving and natural feeling.
Form
Form and line are closely related. Line is considered usually in terms of the outline or edge of objects, whereas form is more encompassing. The concept of form is related also to the size of an object or area. Form can be discussed in terms of individual plant growth habits or as the planting arrangement in a landscape.
Plant forms include upright, oval, columnar, spreading, broad spreading, weeping, etc. Form is basically the shape and structure of a plant or mass of plants. Structures also have form and should be considered as such when designing the area around them.
Texture
Texture describes the surface quality of an object than can be seen or felt. Surfaces in the landscape includes buildings, walks, patios, groundcovers and plants. The texture of plants differs as the relationships between the leaves, twigs and branches differ . Coarse, medium or fine could be used to describe texture but so could smooth, rough, glossy or dull.
Scale
Scale refers to the size of an object or objects in relation to the surroundings. Size refers to definite measurements while scale describes the size relationship between adjacent objects. The size of plantings and buildings compared on the human scale must be considered.
Principles of Design
Color, line, form, texture and scale are tools ,which are used in combinations to adjust design principles. Design principles include unity, balance, transition, focalization, proportion, rhythm, repetition and simplicity. All these principles interact to yield the intended design.
Unity is obtained by the effective use of components in a design to express a main idea through consistent style. Unity is emphasized by consistency of character between units in the landscape. Use of elements to express a specific theme within units creates harmony. Unity can be achieved by using mass planting and repetition.
Unity means that all parts of the composition or landscape go together; they fit. A natural feeling evolves when each activity area belongs to and blends with the entire landscape. Everything selected for a landscape must complement the central scheme and must, above all, serve some functional purpose.
Balance in design refers to the equilibrium or equality of visual attraction. Symmetrical balance is achieved when one side of the design is a mirror image of the other side. There is a distinct dividing line between the two sides. Equal lines, forms, textures or colors are on each side of a symmetrical design.
Asymmetrical balance uses different forms, colors and textures to obtain balance of visual attraction. These opposing compositions on either side of the central axis create equal attraction. For example, mass may be opposed by color or linear dimension by height.
The landscape designer must skillfully manipulate the design elements to create asymmetrical balance. The central axis must be predetermined and then developed by the elements of art and other principles of design discussed in this publication.
Transition is gradual change. Transition in color can be illustrated by the radial sequence on the color wheel (monochromatic color scheme) previously discussed. Transition can be obtained by the arrangement of objects with varying textures, forms, or sizes in a logical sequential order. For example, coarse to medium to fine textures, round to oval to linear structural forms, or cylindrical to globular to prostrate plants. An unlimited number of schemes exist by combining elements of various size, form, texture and color to create transition. Remember, transition refers to the 3-dimensional perspective of composition, not just the flat or facial view.
It is possible to use transition to extend visual dimensions beyond actual dimensions. For example, radical lines in the private area of the landscape can be used to enframe and/or focalize a lake scene. Transition of plant materials along these lines can make the scene become a part of the landscape. Transition from taller to shorter plants with textural changes from coarse to fine along focal lines emphasizes the beauty of a lake scene. Transition from shorter to taller plants and from fine to coarse textures would enframe the scene and make it appear closer, like a painting on a wall. Generally, transition assists in the gradual movement of a viewer's eye to the design and within it.
Proportion refers to the size of parts of the design in relation to each other and to the design as a whole. One large towering oak may compliment an office building but would probably dwarf a single story residence . A three-foot pool would be lost in a large open lawn but would fit beautifully into a small private area. And of course, a colossal fountain would dominate a private garden but could enhance a large city plaza.
Proportion in landscape design usually relates to people and their activities. The desired size relationships of components in a design should pose little problem for the designer who considers this principle routinely in systematic thought processes.
原文网址:http://www.pipcn.com/research/200906/12354.htm
也许您还喜欢阅读: